V112-3.45 MW®
The V112-3.45 MW® is designed for high wind sites and offers high grid compatibility.
V112-3.45 MW® at a glance
The V112-3.45 MW® IEC IA is a high-wind turbine and has a very high capacity factor. Similar to the other 4 MW turbines, the V112-3.45 MW® IEC IA turbine makes efficient use of its grid compatibility and is an optimal choice for sites with MW constraints.
On high wind-sites the V105-3.45 MW™, V112-3.45 MW® and V117-3.45 MW® are excellent turbine choices. A combination of the three variants can optimise your site layout and improve your production significantly. Due to the similar electrical properties, sound emissions and nacelle design, it is easy to mix and match the turbines from the 4 MW platform to maximise production on heavily constrained sites.
- High Wind Operation
- Power Optimised Mode
- Condition Monitoring System
- Service Personnel Lift
- Vestas Ice Detection
- Vestas De-Icing
- Low Temperature Operation to -30°C
- Fire Suppression
- Vestas Shadow Flicker Control System
- Vestas Bat Protection System
- Nacelle Hatch for Air Inlet
- Aviation Lights
- Aviation Markings on the Blades
- Vestas InteliLight™
4 MW
IEC IA
+57 GW
V112-3.45 MW® is designed for high-wind sites.
Technical specifications
POWER REGULATION OPERATIONAL DATA
SOUND POWER
ROTOR
NACELLE DIMENSIONS
ELECTRICAL
GEARBOX
TOWER
HUB DIMENSIONS
BLADE DIMENSIONS
SUSTAINABILITY METRICS
4 MW Platform
Our 4 MW platform is designed for a broad range of wind and site conditions, onshore and offshore enabling you to mix turbines across your site or portfolio of sites, delivering industry-leading reliability, serviceability and exceptional energy capture.
The 4 MW platform was introduced in 2010 with the launch of the V112-3.0 MW®. Over 57 GW of the 4 MW platform has been installed all over the world onshore and offshore making it the obvious choice for customers looking for highly flexible and trustworthy turbines.
Rotor diameters range from 105 to 155 meters and the rated output power is up to 4.5 MW. Using well proven technologies like a full-scale converter, the 4 MW platform meets even the most challenging grid requirements providing excellent energy yield in all wind and weather conditions.
Large Diameter Steel Towers (LDST) are also available to optimise annual energy production on low wind sites.
The 4 MW platform combines Vestas’ proven track record with our continuous efforts to improve and optimise our products, making it the obvious choice for customers looking to combine reliability with performance.