This website uses cookies. The third part cookies used on this website are used to gather information about how people navigate the site. If you continue to use our website, you accept the use of cookies. Find out more about cookies used on vestas.com and how to delete them here.

Introducing

4.2 MW rating

with three new turbines

4 MW platform  
Building on state of the art technology, Vestas introduces the V117-4.2 MW™, V136-4.2 MW™ V150-4.2 MW™. As a result, the platform name is updated from 3 MW to 4 MW. The fourth major upgrade since 2010 extends the proven platform and strengthens performance, achieveing double digit AEP gains in low, medium, and high wind conditions.

Industry’s largest onshore rotor 

The V150-4.2 MW delivers class leading AEP achieved through evolutionary development of a thoroughly understood platform, resulting in 20+ percent more AEP in low wind while decreasing the maximum sound power level. The 150 meter rotor is 10 percent longer than the 136 m rotor while maintaining blade root diameter. This is enabled by advanced blade technology, developed with Vestas most advanced aerodynamic design and materials to increase stiffness.

4.0 MW
nominal rating
up to 4.2 MW Power Optimised Mode
21% AEP
increase
V150-4.2 MW™
103.9
dB(A)
V136-4.2 MW™

Download our 4 MW brochure below or

read more about the 4 MW portfolio at vestas.com